fbpx
South Railton Vermont Bridge Rehabilitation

South Railton Vermont Bridge Rehabilitation

South Railton Vermont Bridge Rehabilitation PROBLEM: Bridge concrete deterioration. Surface deterioration, Corrosion of the embedded rebar, & Delamination STRUCTURE: “South Railton”, Vermont. Rail bridge, Rehabilitation     PROBLEM: The rail bridge was...
NASA Launchpad 39A Case Study

NASA Launchpad 39A Case Study

Kennedy Space Center PROBLEM: Severe concrete deterioration from combination of atmospheric chlorides and fuel emission STRUCTURE: Rocker Panel Base, Launch Pad 39A     PROBLEM: The Rocker panel base of Launch Pad 39A was experiencing severe concrete...
Oklahoma DOT Bridge Case Study

Oklahoma DOT Bridge Case Study

Oklahoma D.O.T. Bridges Case Study PROBLEM: Demonstration of Surtreat products on bridges with visible spalling of the decks and bent caps STRUCTURE: Structural concrete bridge decks along I-40 in Oklahoma     PROBLEM: Surtreat personnel, at the suggestion...
Seong Nam Airfield

Seong Nam Airfield

Seong Nam Airfield PROBLEM: Concern about top surface loss due to traffic exposing the underlying steel fibers STRUCTURE: Seong Nam Airfield, Seoul, Republic of Korea     PROBLEM: Airfield pavement is in part a concrete overlay. Other sections are full depth...